biotechrestorations.com

BIOTECH RESTORATIONS
BIOTECH RESTORATIONS
  • Home
  • About Us
    • What We Clean Up
    • Company Information
    • Management Team
    • Compliance
  • Newsroom
  • Case Studies
    • White Papers
    • Customer Studies
    • In The News
  • Contact Us
  • More
    • Home
    • About Us
      • What We Clean Up
      • Company Information
      • Management Team
      • Compliance
    • Newsroom
    • Case Studies
      • White Papers
      • Customer Studies
      • In The News
    • Contact Us
  • Home
  • About Us
    • What We Clean Up
    • Company Information
    • Management Team
    • Compliance
  • Newsroom
  • Case Studies
    • White Papers
    • Customer Studies
    • In The News
  • Contact Us

Customer Studies

McCandless Proposed K-6 School Approval

Approval of the soil remediation report, Milpitas Unified School District, McCandless proposed K-6 school site.

The soil removal and bioremediation were conducted in accordance with the DTSC-approved Removal Action Workplan (RAW - Padre, February 5, 2016). Soil impacted with naturally-occurring asbestos (NOA) will be mitigated as part of the school construction. 

In-situ bioremediation was completed for approximately 16,400 cubic yards of PCB-contaminated soil. 

Read Complete Approval Letter Here

Housatonic - Great Barrington, MA Dioxin Study

  • Significant reduction in remediation costs
  • >30% to 50% less than conventional alternatives
  • No long term O&M costs
  • Eliminate pollutants as opposed to creating landfills
  • No deed or access restrictions
  • Minimal footprint in treatment areas
  • Drench treatment for upland soils without destructive impacts
  • Low impact treatment for waterfront areas 
  • Low impact, minimal carbon foot print 
  • Best possible green and sustainable remediation option
  • EPA Cleanups: GE-Pittsfield/Housatonic River Site

Get the Details

Customer Results from 2008 to 2015

These results for pesticide, PCB, and Dioxin remediation are documented for multiple projects in Georgia, California, Arizona, Florida, and North Carolina.  The document may be found in the button below.

Consolidated Remediation Document

California properties 2005 - 2007

  • The Borello Property is located in Santa Clara County, CA. The property consists of a 14 acre parcel previously contaminated with elevated concentrations of Toxaphene and Dieldrin in the surface soil from pesticide use as an orchard from the early 1900s.
  • North American Transformer - South Yard Property; Santa Clara County, CA. Over 16,000 cubic yards of soil was polluted with Aroclor 1254 and 1260 PCBs.
  • Mantegani Property; South San Francisco, CA. 0.6acre parcel polluted with the pesticides DDT, DDE,chlordane, Endosulfan II, and Dieldrin, from the 19302 through the 1980s.

Read About All Three Here

This is the first step in the most cost effective method of removing your environmental liability! Contact us today for a no-obligation quote.

Contact Us

Rethinking Clean from the Ground Up

Copyright © 2000-2023 - All Rights Reserved


BIOTECH RESTORATIONS, LLC